InvestorsHub Logo
Followers 5
Posts 149
Boards Moderated 0
Alias Born 07/25/2008

Re: None

Wednesday, 03/15/2017 10:56:07 AM

Wednesday, March 15, 2017 10:56:07 AM

Post# of 24230
Transcript of cc is posted on Seeking Alpha.

http://seekingalpha.com/article/4054300-comstock-minings-lode-ceo-corrado-de-gasperis-q4-2016-results-earnings-call-transcript


To read full transcript you would have to sign up for a free account if you don't already have one.

The 43-101 question is asked and answered along with other ramblings.

One must know how to read between the lines. Example: if the drilling reveals more positive than expected, they will most likely continue with the drill program and the 43-101 will be delayed. If the modeling is accurate, the weather allows them to begin drilling on their pre-determined schedule, the contractor is available and they have funds, they will complete drilling in October and use the winter time to work on the report.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent LODE News