That report was filed. Here are a few excerpts:

2E03 JBI Plastic2Oil NYS DEC Annual BUD report (998-9-32) for 2014 filed 2/27/2015

#3 Processing Unit only ran during January 2014, and then was shut down and remained down through 12/31/14.

Neither #1 nor #2 Processing Unit was operated at any time in 2014.

The entire plant remained shut down for the rest of 2014 for business reasons.


Preparation Date: Febraury 27,2015

Required Information: Information required to be provided in the annual report for BUD #998-9-32
is as follows:

Item 1: Total Naptha produced from 1/1/2014 through 12/31/2014
(Includes No. 6 Oil, No. 2 Diesel, and Light Naptha) is as follows:



No. 6 Oil - 0 gallons
No. 2 Diesel - 9,830 gallons
Light Naptha - 3,129 gallons
--------------
Total - 12,959 gallons




**********

2014 Annual Report for JBI RE #1. Inc.'s Plastic2Oil Facility in Niagara Falls, New York
as required by Solid Waste Managemewnt Permit ID 9-2911-0348/00003
Reporting Period from 1/1/2014 through 12/31/2014)

Prepared February 27, 2015

Item 5: Changes/Deviations from Approved Plans/Permit

General Operations

#3 Processing Unit only ran during January 2014, and then was shut down and remained down through
12/31/14. Neither #1 nor #2 Processing Unit was operated at any time in 2014. The entire plant remained
shut down for the rest of 2014 for business reasons.



(Compliments of somebody else, posted someplace else.)

If any regulator or plaintiff's attorney cared they could certainly use the above filing as a starting point for a line of questioning that begins: "When and how, Mr. Heddle, was this information first made public?".

“I have had a wonderful time but this wasn't it.”
..........Groucho