InvestorsHub Logo
Followers 328
Posts 92770
Boards Moderated 3
Alias Born 07/06/2002

Re: None

Friday, 05/08/2015 8:54:04 AM

Friday, May 08, 2015 8:54:04 AM

Post# of 1360
Silver Bull Updates It's NI43-101 Resource To 4.670 Billion Pounds Of Zinc, Including 2.426 Billion Pounds At An Average Grade Of 11% Zinc In The Measured And Indicated Category At The Sierra Mojada Project, Coahuila, Mexico.

Vancouver, British Columbia
- May 5, 2015 - Silver Bull Resources, Inc. (NYSE-MKT: SVBL, TSX: SVB) ("Silver Bull") is pleased to provide an updated NI43-101 Resource report for the Sierra Mojada Project in Coahuila, Mexico. Highlights include;

1) A "Measured and Indicated" (M&I) Global resource of 58.7 million tonnes grading at 3.6% zinc and 50 g/t silver for 4.670 billion pounds of zinc and 90.8 million ounces of silver.

2) An open pittable high grade "Zinc Zone" within the Global resource of 10.03 million tonnes at an average grade of 11% Zinc at a 6% cutoff for 2.426 billion pounds of zinc.

3) An open pittable high grade "Silver zone" within the Global resource of 19 million tonnes at an average grade of 102.5 g/t at a 50g/t cutoff for 62.6 million ounces of silver.

4) An additional underground "Measured and Indicated" resource outside of the open pit resource of 1.9 million tonnes at an average grade of 9.4% Zinc at a 6% cutoff for 388.5 million pounds of zinc.

The Global Resource:
The global resource is an average of the zinc, silver, copper and lead mineralization across the entire ore body and is broken into two parts: 1) An open pittable resource that has been defined using a "Lerchs-Grossman" (LG) optimized pit and which represents 96% of the total deposit, and 2) An additional underground resource which represents mineralization that was not included in the open pit due to its depth, but may be economic if mined from underground. Tables of the combined total resource (LG Pit + underground) and of the individual LG pit resource and underground resource are shown below (see figure 1).

(Click on the link below to view Table 1 and the notes accompaning the Sierra Mojada Resource table.)

In order to establish the economics in an open pit context, the reported resource falls within a LG Optimized pit shell that uses a zinc price of US$1.00/lb and a silver price of US$18/oz with a recovery of silver estimated at 75% and zinc at 41%. Pit walls are set at 55 degrees overall, mining costs were assumed to be US$1.50/tonne, and silver and zinc processing costs were assumed to be US$12.00/tonne, which results in a total NSR cutoff for the resource of $13.50/tonne. The underground zinc resource was estimated at a 6% cutoff.

Mineral resources were estimated by ordinary Kriging using GEMSTM modeling software in multiple passes using 10 meter X 10 meter X 10 meter blocks as the SMU size. The geologic wireframes were updated and a percentage model technique utilized to calculate accurate volumes. Grade estimates were based on 1 meter composited assay data with search radius restricted to a 20 meter search radius when a zone dependent cap limit was reached. Blocks have been classified as measured, indicated or inferred mineral resources.

The mineral resource has been estimated by Allan Reeves P.Geo. of Tuun Consulting Inc. and Tony Loschiavo P.Eng. of AFK Mining Services Inc. Both Mr. Reeves and Mr. Loschiavo are Independent Qualified Persons as defined by National Instrument 43-101 and will be responsible for the Technical Report which will be filed on the SEDAR website within the next 45 days. As a consultant, Mr. Reeves has spent approximately 250 days onsite over a 3 year period providing technical advice and direction to the Silver Bull team.

GLOBAL RESOURCE

Figure 1. Image showing the Global resource which is comprised of the addition of the resource defined in the Lerchs-Grossman pit and the underground resource.

The High Grade Zinc and Silver Zones:
The Global Resource encompasses two high grade zones of oxide mineralization; the zinc zone, and the silver zone and represents an overall average grade for the silver and zinc mineralization across the entire deposit. This average grade does not accurately reflect the discrete, high grade zoning of the silver and zinc mineralization that occurs within the resource. To better reflect high grade silver and zinc zones which form separate coherent bodies within the larger global resource we have broken out the zinc and silver mineralization using zinc and silver cutoff grades. The tables are shown below:


Table 2. Table showing the high grade "Zinc Zone" defined using various zinc cutoff grades.


Table 3. Table showing the high grade "Silver Zone" defined using various silver cutoff grades.


Figure 2. Image showing the approximate locations within the Global Resource of the high grade Silver Zone at a 50g/t Ag cutoff grade and Zinc Zone at a 6% Zn cutoff grade.

Preliminary Economic Assessment and changes in the resource:
In March 2013 Silver Bull released a NI43-101 resource update on the Sierra Mojada project. A Preliminary Economic Assessment ("PEA") that was released in December 2013 was based on that resource update. This new NI43-101 resource update supersedes the NI43-101 Resource and PEA. Key changes made to this resource update relative to the March 2013 report and PEA include the following: Re-pricing and re-modeling of the resource using US$1.00/lb zinc and US$18/oz silver instead of US$0.95/lb Zinc and US$29.20/oz silver; the inclusion, for the first time, of the high grade zinc zone within the resource shell, resulting in a significant increase in the zinc resource; and the continued improvement of the grade shell used to define the area of mineralization due to a better understanding of the geology.

Tim Barry, President, CEO and director of Silver Bull states, "We have aimed to do two things in this updated resource report: bring all of the known zinc mineralization into the story for the first time, and update the silver resource using prices applicable to the current market conditions. Although updating the silver resource estimate means we reduce the total number of silver ounces we can now report, we still retain one of the largest undeveloped silver resources in Mexico that has been modeled on a silver price realistic to the current market conditions. Furthermore the decision to increase our focus on the zinc at Sierra Mojada is in recognition of the continued improvement in its fundamentals. Some of factors behind the tightening zinc market include:

1) Improving Western demand, combined with record metal imports into China during 2014 has resulted in a significant global draw down of zinc metal inventories.

2) Lower inventories, tightening spreads, and increased prices all point to a zinc metal deficit already in early 2015.

3) Planned closures of a number of a number of large zinc mines including; the Century, Lisheen, and Skorpion Mines representing an overall reduction of approximately 10% of global zinc production is forecast.

4) Lack of new major projects coming on line to meet the projected demand which is potentially creating a zinc supply gap.

The Sierra Mojada project is one of only a handful with any appreciable zinc resources and is one of the largest undeveloped silver-zinc projects in Mexico. It has excellent infrastructure; it is located 3 hours from an international airport with a paved road right to site; it has a functioning railway right to site; runs on grid power; and it has a skilled mining work force to draw upon in the immediate local area. The resource provides exposure to both the precious and base metals markets and has the potential to be scaled in size depending on metal prices. In short, we believe there are not many projects like this in the world".


About Silver Bull: Silver Bull is a US registered mineral exploration company listed on both the NYSE MKT and TSX stock exchanges and based out of Vancouver, Canada. The flag ship "Sierra Mojada" project is located 150 kilometers north of the city of Torreon in Coahuila, Mexico, and is highly prospective for silver and zinc.

The technical information of this news release has been reviewed and approved by Tim Barry, a Chartered Professional Geologist (CPAusIMM), and a qualified person for the purposes of National Instrument 43-101.

On behalf of the Board of Directors

"Tim Barry"

Tim Barry, CPAusIMM
Chief Executive Officer, President and Director

INVESTOR RELATIONS:
+1 604 687 5800
info@silverbullresources.com

http://www.silverbullresources.com/s/news.asp?ReportID=706221







Dan

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.