InvestorsHub Logo
Followers 24
Posts 1606
Boards Moderated 0
Alias Born 12/08/2013

Re: BRoubos post# 29766

Thursday, 01/29/2015 1:54:46 PM

Thursday, January 29, 2015 1:54:46 PM

Post# of 81998
Thanks BR. Although the GE ramp begins and 2015 and have stated that they will equip the factory in early 2015 with a big production ramp through 2015-16 and full to follow. I would venture to guess that PR3D will be needed sooner than later as soon as production begins. Aerospace = quality is EVERYTHING. Especially with GE. I have worked with them and they are the toughest when it comes to quality control documentation.

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent SASI News