Aurcana Announces New Mineral Resource Estimate for the La Negra Mining Operation

VANCOUVER, BRITISH COLUMBIA, Dec 03, 2014 (Marketwired via COMTEX) -- Aurcana Corporation ("Aurcana" or the "Company") (AUN)(otcqx:AUNFF) is pleased to announce an updated resource estimate for the La Negra Mine, the Company's silver, zinc, lead and copper mining operation located in the State of Queretaro, Mexico.

AMC Mining Consultants (Canada) Limited ("AMC"), an independent mining consulting firm, has recently prepared a new mineral resource estimate (the "Estimate") for the Company's La Negra mine. The Estimate is based on 14,578 assays comprised of 4,074 drillhole samples, 8,674 channel samples, and 1,829 longhole samples obtained by Minera La Negra S.A. de C.V. (a subsidiary of Aurcana) during the period from 2006 through to 2014, and by Industriales Penoles S.A. de C.V. from 1967 to 2000. A summary of the Estimate is tabulated below:

MEASURED AND INDICATED RESOURCES FOR ALL DEPOSITS AND ALL BLOCKS WITH A MINIMUM RECOVERED VALUE OF US$30 AS OF SEPTEMBER 30, 2014

-----------------------------------------------------------------------
-----
Silver
Silver Copper Lead Zinc Equivalent
Classification Tonnes (g/t) (%) (%) (%) (g/t)
----------------------------------------------------------------------------
Measured 1,977,000 107 0.61 0.50 2.23 203
----------------------------------------------------------------------------
Indicated 2,748,000 54 0.45 0.22 1.04 110
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Measured plus
Indicated 4,724,000 76 0.52 0.34 1.54 149
----------------------------------------------------------------------------
--------------------------------------------------------------------------
In Situ Metal Quantities
------------------------------------------------------------
Classification Silver
Silver Copper Lead Zinc Equivalent
(oz.) (lb.) (lb.) (lb.) (ounces)
--------------------------------------------------------------------------
Measured 6,821,600 26,777,200 21,869,800 97,347,600 12,907,200
--------------------------------------------------------------------------
Indicated 4,758,400 27,439,800 13,119,000 63,111,100 9,700,400
--------------------------------------------------------------------------
Measured plus
Indicated 11,577,700 54,205,800 34,982,000 160,427,200 22,607,600
--------------------------------------------------------------------------


Ounces and pounds of in situ metal are calculated using only resource blocks with a recovered value of US$30 or greater, which corresponds generally with the $32/tonne operating cost provided by Aurcana for the La Negra Mine from January to October 2014. Metal prices and recoveries used for value and silver equivalent estimates are: Silver - $21.50/83%; Copper - $3.10/75%; Lead - $0.95/78%; Zinc - $1.00/80%. Silver equivalence is calculated using the following formula:

Silver equivalent=(((grade silver g/t)x((US$price silver /Troy Ounce)/31.10348)x(recovery of silver))+((grade copper %)x(US$price of copper/poundx22.046)x(recovery of copper))+((grade lead %)x(US$price of lead/poundx22.046)x(recovery of lead))+ ((grade zinc %)x(US$price of zincpoundx22.046)x(recovery of zinc))) divided by the price of silver/ounce to calculate silver equivalent in ounces, or by the price of silver in grams to calculate gram equivalency.

INFERRED RESOURCES FOR ALL DEPOSITS AND ALL BLOCKS WITH A MINIMUM RECOVERED VALUE OF US$30 PER TONNE


-----------------------------------------------------------------------
-----
Silver Silver
Silver Copper Lead Zinc Equivalent Equivalent
Classification Tonnes (g/t) (%) (%) (%) Grade (g/t) Ounces
----------------------------------------------------------------------------
Inferred 642,000 55 0.55 0.18 1.54 130 2,676,800
----------------------------------------------------------------------------


Notes:

1. Mineral Resources are not Mineral Reserves and do not have demonstrated
economic viability. There is no certainty that all or any part of the
estimated Mineral Resources will be converted into Mineral Reserves. The
Estimate may be materially affected by environmental, permitting, legal,
title, taxation, sociopolitical, marketing, or other relevant issues. La
Negra is a producing mine; key risk factors that may have an adverse
effect on the continued development of the mineral resources estimated
herein include Mexican taxation issues and metals prices.
2. The Mineral Resources were estimated in accordance with the Canadian
Institute of Mining, Metallurgy and Petroleum ("CIM"), CIM Standards on
Mineral Resources and Reserves, Definitions and Guidelines prepared by
the Standards Committee on Reserve Definitions and adopted by the CIM
Council on November 27, 2010.
3. Mineral Resources tonnage and contained metal have been rounded: tonnes
to the nearest 1,000; silver to the nearest gram; copper, lead and zinc
to the nearest two decimal places, to reflect the accuracy of the
estimate. Numbers may not add up due to rounding.


Three dimensional solid models of eleven mineralized zones were generated by Aurcana using SURPAC(TM) geological software; the solids were then used to constrain the resource estimate for each mineral zone. Solid models of the underground workings were also provided by Aurcana and the workings were subtracted from the mineral zone solids used to estimate the quantities of resources. Therefore the Mineral Resources (grades and tonnes) were estimated within the geological solid models with the workings extracted. The Estimate was created using DATAMINE Studio 3 software.

A block model was created to contain all eleven mineralized zones. Within individual zones the size of resource estimation blocks used do not exceed 5 x 5 x 5 metres and are not diluted. The grades in the block model were estimated using ordinary kriging.

Qualified Persons & Technical Report

The Estimate has an effective date of September 30, 2014, meets the guidelines and form as set out in National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and CIM standards, and was prepared for Aurcana by AMC. The resource estimation was undertaken by Greg Z. Mosher, P.Geo of AMC, a qualified person as defined under NI 43-101 reporting requirements. Mr. Mosher has consented to applicable disclosure contained herein regarding the Estimate. Mr. Mosher is independent of Aurcana and its subsidiary companies.

AMC is currently preparing a Technical Report in support of the Estimate. This report will be filed by the company in its entirety on SEDAR (www.sedar.com) within 45 days of the date of this news release.

About Aurcana's La Negra Mine

The La Negra mine was discovered and developed by Industriales Penoles S.A. de C.V ("Penoles"). The mine commenced production in 1970 as an underground operation and produced at 800 tonnes per day ("tpd") until the mine was put on care and maintenance in 2000. During this 30-year period Penoles mined approximately 6,600,000 tonnes of ore producing 36 million ounces of silver, 323 million pounds of zinc, 70 million pounds of copper, and 161 million pounds of lead. In 2006 Aurcana Corporation acquired an initial 80% joint venture interest in the property, subsequently increasing its interest to 99.86%. La Negra was placed back into production June 1, 2007 by Aurcana at a rate of 1,000 tpd.


-- Between June 1, 2007 and December 31, 2013 Aurcana mined 3,226,000
tonnes grading 73 g/t silver, 1.27% zinc, 0.37% lead and 0.49% copper at
the La Negra Mine.
-- In the first nine months of 2014 725,388 tonnes were milled at the La
Negra mine producing 1,102,222 ounces of silver and 26,126 tonnes of
copper, lead and zinc concentrates.
-- Since 2007 Aurcana has mined in excess of three times the estimated
tonnage of the mineral inventory as calculated by Penoles prior to the
time of Aurcana's acquisition of the La Negra Mine and as of this
current resource estimate continues to extend the potential mine life as
a result of successful in-mine exploration. Approximately 35% of
production at the La Negra Mine comes from outside the areas included in
the last mineral resource estimate on the La Negra Mine, which was
prepared on behalf of Aurcana in 2012.
-- Mineralization occurs as mantos or chimneys within skarn developed along
the contact between diorite intrusions and Lower Cretaceous limestone
strata. Individual mantos vary in size with dimensions ranging from 40
meters to 300 meters long, from 0.50 meters to 40 meters thick and up to
300 metres in height.


The Company's management believes that the opportunity to find and develop new zones of mineralization at La Negra is excellent. The new three-dimensional models prepared in connection with the Estimate serve the purpose of not only constraining resource block models but also highlights unexplored gaps between existing mantos and obvious mineralized trends. Thus far five exploration targets have been flagged for further drilling, all within 200 metres of existing underground workings. These near-term targets mesh well with La Negra's large, 82,000 hectare property position in the region, known to host similar rock types and structures as are found at La Negra. As metal prices and operating margins improve these brownfields and greenfields exploration opportunities will allow the resumption of aggressive exploration.

Kevin Drover, President and CEO, comments: "This new mineral resource estimate completed by AMC provides Aurcana with a critical tool necessary to plan the mining sequence effectively and efficiently. This new Estimate more precisely represents grade distribution and continuity within the mine area. The model will support life-of-mine planning with the selectivity required to manage grade control and mining-rates that are in-keeping with our operational experience of the past six years."

The technical information contained in this news release has been reviewed by Jerry Blackwell, P.Geo, a Director and technical advisor of the Company. Mr. Blackwell is a Qualified Person ("QP") as defined by NI 43-101.

To view the map associated with this release, please visit the following link: http://media3.marketwire.com/docs/aunff1203fig1.pdf

Corporate

The Company's shares are also traded in the United States on OTCQX under the symbol "AUNFF". Investors can find current financial disclosure and Real-Time Level 2 quotes for the Company on www.otcqx.com and www.otcmarkets.com

ON BEHALF OF THE BOARD OF DIRECTORS OF AURCANA CORPORATION

Kevin Drover, President & CEO

For further information, visit the website at http://www.aurcana.com.

Contact:
Aurcana Corporation
(604) 331-9333 or Toll Free: (866) 532-9333
(604) 633-9179
http://www.aurcana.com

Gary Lindsey
Corporate Relations
(720) 273-6224
gary@strata-star.com

http://finance.yahoo.com/news/aurcana-announces-mineral-estimate-la-213000691.html








Dan

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.