InvestorsHub Logo
Followers 55
Posts 4079
Boards Moderated 3
Alias Born 03/12/2006

Re: bliz82 post# 27

Wednesday, 05/07/2008 9:52:48 AM

Wednesday, May 07, 2008 9:52:48 AM

Post# of 6606
Augmenter Shop Fabrication Time
4/15/08

(1) Dump Panel Hinge Plate, 40 pieces
40 cuts x 2 min/cut= 80 minutes for bottom plate
40 cuts x 2 min/cut= 80 minutes for axle pipe
160 drilled holes x 1 min/hole= 160 minutes for mounting holes
240” of weld x 1 min/inch= 240 minutes of welding pipe to plate

(2) Pole axle plate, 20 pieces
20 cuts x 2 min/cut= 40 minutes for plate
20 cuts x 2 min/cut= 40 minutes for pipe
40 drilled holes x 2 min/hole= 80 minutes for mounting holes
10 drilled holes x 2 min/hole= 20 minutes for axle lock bolt
120” of weld x 1 min/inch= 120 minutes of welding pipe to plate
10 welds for lock nuts x 3 min/weld= 30 minutes of welding

(3) Pole foot plate, 12 pieces
12 cuts x 4 min/cut= 48 minutes for bottom plate
24 cuts x 3 min/cut= 72 minutes for joint plates
48 holes x 3 min/hole= 144 minutes for bottom plate holes
48 holes x 2 min/hole= 96 minutes for joint plate holes
216” of weld x 1 min/inch= 216 minutes of welding joint plates

(4) Tower cable anchors, 4 pieces
4 cuts x 2 min/cut= 8 minutes for cutting 4 x ½” angle
8 holes x 2 min/hole= 16 minutes for mounting holes

Cutting time Drilling time Welding time
(1) 160 160 240
(2) 80 100 150
(3) 120 240 216
(4) 8 16

Totals 368 516 606

25 hours of shop time to fabricate augmenter parts.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent MMMW News